Compare written quotes against the same installed result. Add work that sits outside the seller’s price, give each task an owner and record which amounts still need a quotation.
Originally published · Reviewed
What belongs in an installed-cost comparison?
| Cost line | Evidence to collect | Compare on the same basis |
|---|---|---|
| Machine and agreed work | Serial-numbered quotation, itemised repairs, included auxiliaries, and acceptance milestones. | Align the machine configuration and completion criteria. |
| Door-to-site move | Confirmed packed dimensions, charges from the forwarder and a receiving rigging quote. | Specify which costs each party covers at each handover. |
| Installation and repeat trials | Quotations for local connections, parts still required, lifting and commissioning support. | Record the same planned mold and resin trial for each candidate. |
Keep unquoted costs visible as open lines. If a future expense depends on a trial finding, state the finding that would trigger it and ask who pays. This makes differences in scope traceable without guessing a discount or a payback period.