A trial supports a purchase decision when it identifies the machine, records what actually ran and measures agreed outputs. Ask the seller to mark each result as observed, pending or outside the trial scope.
Originally published · Reviewed
What makes two molding trials comparable?
| Record | Request | If missing |
|---|---|---|
| Machine and setup | Nameplate, installed options, mold ID, cavity configuration, resin grade and conditioning. | Treat the result as specific to the setup that the seller can document. |
| Sampling and run conditions | Agreed observation window, sample timing, process settings, and cavity labels. | A demonstration without those records leaves repeatability open. |
| Accepted and rejected output | Sample identifiers, measured characteristics, reject reasons, alarms and interrupted cycles. | Track named follow-up tests and who will accept their results. |
Agree which checks release payment and which will take place after installation. A seller’s shop run can prove particular functions on that setup. Your plant’s utilities and material handling may change what needs to be tested again.