Before a large press is packed, ask the seller, transport team and receiving plant to agree what will arrive, in how many packages and who signs off at each handover.
Originally published · Reviewed
Which handover decisions should be documented?
| Stage | What to obtain | Receiving decision |
|---|---|---|
| Before loading | Package list cross-referenced to machine serial number, packed dimensions and weights, and the applicable manufacturer handling information. | Have the forwarder and qualified riggers confirm suitability for the planned moves. |
| At delivery | Unload plan, reference photographs and list of disconnected services and removed components. | Record visible discrepancies before installation and identify who handles them. |
| Before site acceptance | Agreed utility information and the remaining work for guards, connections and functional trials. | Use qualified staff and the machine-specific documentation. Sign off against the agreed acceptance scope. |
A loading photo can link a package to a machine. Keep the photo with the dated packing list and the inspection record, and track missing or damaged items on arrival against those references.





